Project Description

Wire Mesh Railway Footbridge

Wire Mesh Fabrications has partnered with Network Rail on a project aimed at ensuring pedestrians’ safety when travelling across a busy level crossing in Brighton located closed to a local primary school.

portfolioimageThe new footbridge replaced the outdated footpath level crossing that was built during the Victorian era where trains where a lot less frequent than they are nowadays with fast, quieter trains much more frequent providing a safe route across the railway crossings on the four-track section of the Brighton Main Line, where around 700 trains pass through every day at speeds of up to 90mph.